Yellow Section - Asphalt Driveways 11/6/25

Update from Cadillac

There is rain in the forecast for tomorrow morning, clearing out by noon. Cadillac plans to get a late start and pour asphalt drives when it is dry enough to do so. They will start on Glengarry Circle East, then move to Indian Mound South and move north around the square. Weather permitting, they will be working on Indian Mound driveways on Friday and Saturday.

Residents will want to move vehicles out of their driveways and park elsewhere before the crew starts. Parking options:

  • Park in a neighbor’s driveway if possible.

  • Indian Mound West (leave room for the driveway to be poured at 1250 Indian Mound West)

  • Glengarry Circle East north of Indian Mound Road

  • Glengarry Circle West

  • N Glengarry Road

  • Covington School, Dorstone, Kent Ridge.

    Please avoid parking on Indian Mound South, Indian Mound Road, Indian Mound East and Indian Mound Trail — there are lots of drives to be poured on those streets.

You should be back in your driveway before the end of the day when your driveway is poured.

Asphalt driveways on Sandringham and the cul-de-sacs will be poured at a later time, probably after the M-openings to the cul-de-sacs have cured.

Thank you for your patience as we navigate schedule adjustments.

Next
Next

Gold Section Schedule Update — 11/4/25