Construction Update — Green Section 11/23/26

Construction update from RCOC

Weeks of 11/23 and 11/30:

  • Sod installation is now complete throughout the Green section. Don’s has already replaced any sod damaged by traffic detouring around the barricades during the past few weeks. Almost all of the sod has already taken root (except for sod laid last week).

  • Sprinkler repairs are complete except on part of Bradway. Don’s Restoration will continue fixing sprinklers for the next few days to complete Bradway properties and any known repairs needed on other streets. Most residents have winterized their systems already; thus any new repairs will need to be tested in the spring. Plan to schedule your contractor to activate your sprinklers as early as possible in the spring, and have them flag any required repairs. Email Wayne Dabrowski and Mark Meszler at the addresses below to notify them of the required repairs. Don’s will be back in the spring to complete repairs on any construction damage. Please note that if you choose to have your contractor repair your sprinklers, you will not be reimbursed for the related cost.

  • Front walks — Don’s will continue front walk replacements over the next week or two, so long as the weather holds. Don’s will be back in the spring to address any walks that can’t be completed this fall.

  • Concrete work — Concrete for front walks and any remaining driveways will be poured on Wednesday 11/25/26.

  • Construction signage will be removed over the next week or so. Porta-johns have already been removed.

Looking ahead

After Thanksgiving, ART will begin work on structure lining (for manholes and catch basins). The vac-truck will be in the neighborhood after Thanksgiving to clean any debris out of the structures. In early 2027, ART will begin lining the cleaned structures. This work can be done throughout the winter, so long as the structures are sufficiently dry. Traffic can usually get by the structure work, although sometimes will be required to detour.

Spring 2027

Don’s Restoration will return in the spring to address any sprinkler fixes, and any sod that did not take root. Please note that damage caused by the snowplow or vehicles driving on the sod this winter is considered normal wear and tear, not construction damage. As such, Don’s will not be obligated to repair those areas in the spring.

Any punch list items that cannot be completed this fall will be addressed in the spring.

Contacts during construction
Questions or concerns should be addressed to Wayne Dabrowski, Project Engineer for RCOC, with a copy to Mark Meszler, Bloomfield Township representative for the project.

‍ ‍wdabrowski@rcoc.org

mmeszler@roadrehab.solutions

Next
Next

Construction Update — Green Section 11/11/26